Licensed asbestos removal specialist in hazmat suit safely removing asbestos sheeting
Licensed & Regulated

Asbestos Removal & Disposal

From identification through to certified disposal — managed end-to-end by the Smart Group.

One team. Complete asbestos management.

Asbestos requires specialist handling at every stage — removal, containment, transport, and disposal. The Smart Group brings together two licensed operations to deliver the full chain under one point of contact:

DemoSmart — A Smart Group Company

Physical removal

Licensed asbestos removalists. Class A and B removal from residential, commercial, and industrial sites across Victoria.

BinSmart — A Smart Group Company

Containment, transport & disposal

EPA-licensed carrier and transporter of bonded asbestos. Dedicated asbestos skip bins, compliant transport, and certified disposal.

How it works

1

Identify & assess

Our team assesses the site, confirms the presence and type of asbestos-containing material (ACM), and scopes the removal.

2

Safe removal

DemoSmart's licensed removalists safely strip and bag the material following WorkSafe Victoria Class A/B protocols.

3

Secure containment

Bagged asbestos is loaded into a dedicated BinSmart asbestos skip bin — sealed, labelled, and compliant.

4

Licensed transport & disposal

BinSmart transports the sealed bin to an EPA-licensed disposal facility. You receive a tracking certificate on completion.

Asbestos bin pricing

BinSmart licensed asbestos skip bin with Kobelco excavator at Hastings depot

Dedicated asbestos skip bins available for self-load (removal by others) or as part of a full DemoSmart removal package.

4m³Skip & Hook
$1,968.76(incl. GST & 5% fuel levy)
6m³Skip & Hook
$2,572.50(incl. GST & 5% fuel levy)

Prices are exclusive of GST. Includes delivery, 7-day hire, collection, and disposal at one of our EPA-licensed facilities.

Book an asbestos bin

Licensing & compliance

Licensed Asbestos Removal & Cartage

Licensed carrier and transporter of bonded asbestos under EPA Victoria. Compliant with the Environment Protection Regulations 2021 and WorkSafe Victoria guidelines.

EPA Victoria Licence

Licensed transfer-station and prescribed-waste operations at both Campbellfield and Hastings facilities.

Asbestos is a hazardous material regulated under Victorian law. Unlicensed removal, transport, or disposal carries significant penalties. Always use licensed operators.

Asbestos removal from start to finish

Asbestos removal isn't a single event — it's a regulated chain of custody from identification through to certified disposal. Here's what actually happens at each stage, and why each step matters.

1. Identification and testing

Before any work begins, a sample of the suspected material is sent to a NATA-accredited laboratory for analysis. Visual identification alone is not reliable — many materials that look like asbestos aren't, and many that don't look like it are. Testing costs between $30–$80 per sample and takes 2–5 business days. We can arrange testing as part of the initial site assessment.

2. Site assessment and removal plan

Once asbestos is confirmed, our team assesses the site to determine the scope of removal — how much material, what condition it's in (friable vs bonded), access constraints, and whether other trades need to be cleared from the area. A removal control plan is prepared and, for quantities over 10m², a notification is submitted to WorkSafe Victoria at least 5 days before work begins.

3. Containment and removal

The removal area is sealed with plastic sheeting and negative air pressure units (for friable asbestos). Workers wear full PPE including P2 respirators and disposable coveralls. Material is wetted to suppress fibres, carefully removed without breaking, and immediately double-bagged in 200-micron polyethylene. Warning labels are applied to every bag.

4. Air monitoring and clearance

After removal, an independent hygienist conducts air monitoring to confirm fibre levels are below the safe threshold (0.01 fibres/mL). A clearance certificate is issued before the area is released for other work. This step is legally required for friable asbestos removal and recommended for all jobs.

5. Transport and disposal

Sealed bags are loaded into a dedicated asbestos skip bin — not mixed with any other waste. BinSmart transports the bin under our EPA carrier licence to a prescribed waste facility. A waste transport certificate is generated for every load, providing a complete chain-of-custody record from site to landfill cell.

6. Documentation and compliance

You receive a complete documentation package: removal certificate, clearance certificate, waste transport certificate, and disposal receipt. This package satisfies council requirements for demolition permits, property sale disclosures, and WorkSafe compliance records.

What people ask us about asbestos

These are the questions we hear most often from homeowners and builders. The answers are based on current Victorian regulations and our operational experience.

How do I know if my house has asbestos?

If your home was built or renovated before 1990, there's a reasonable chance it contains asbestos-containing materials (ACMs). Common locations include roof sheeting, eaves, internal wall linings (fibro), bathroom and laundry walls, fencing, and vinyl floor backing. The only way to confirm is laboratory testing — visual inspection alone is not reliable.

Can I remove asbestos myself?

In Victoria, a homeowner can remove up to 10m² of non-friable (bonded) asbestos from their own residential property without a licence. However, this is strongly discouraged. Improper removal creates airborne fibres that are invisible and extremely dangerous. For anything above 10m², or any friable asbestos, a licensed removalist is legally required.

What's the difference between friable and non-friable asbestos?

Non-friable (bonded): Asbestos fibres are locked within a binding material (cement, vinyl, resin). It's only dangerous when cut, drilled, broken, or deteriorated. Examples: fibro sheeting, floor tiles, cement pipes. Friable: Material that can be crumbled or reduced to powder by hand pressure. Extremely dangerous — fibres become airborne easily. Examples: pipe lagging, sprayed insulation, damaged bonded material. Friable asbestos requires Class A removal (the highest licence class).

How much does asbestos removal cost?

Costs vary significantly based on the type of material, quantity, accessibility, and whether it's friable or bonded. A small residential job (e.g. removing eaves from a single-storey house) might cost $2,000–$5,000. A full roof removal on a large house could be $15,000–$30,000+. We provide fixed-price quotes after site assessment — no surprises.

Do I need a permit to demolish a house with asbestos?

Yes. Before a demolition permit is issued, the council requires evidence that all asbestos has been identified and a removal plan is in place. In most cases, asbestos must be removed before general demolition can begin. The Smart Group handles this entire sequence — asbestos removal first (DemoSmart), then demolition and waste removal (BinSmart).

What happens if asbestos is found during renovation?

All work must stop immediately. The area should be sealed off and no further disturbance should occur until a licensed assessor inspects the material. If confirmed as asbestos, it must be removed by a licensed removalist before other work can resume. This is a legal requirement under the OHS Regulations 2017.

Victorian asbestos regulations — what you need to know

Asbestos handling in Victoria is governed by multiple overlapping regulations. Here's a plain-English summary of the key rules that affect property owners and builders.

Removal licensing

Class A licence: required for any friable asbestos removal. Class B licence: required for non-friable asbestos removal over 10m². Both are issued by WorkSafe Victoria. DemoSmart holds both Class A and Class B licences.

Notification requirements

For removal of more than 10m² of non-friable asbestos, or any amount of friable asbestos, a written notification must be submitted to WorkSafe Victoria at least 5 business days before work begins. We handle this as part of our standard process.

Transport requirements

Asbestos waste must be transported by a licensed carrier in sealed, labelled containers. A waste transport certificate must accompany every load. BinSmart is licensed as both a carrier and transporter of prescribed waste under EPA Victoria.

Disposal requirements

Asbestos waste must be disposed of at a facility licensed to accept prescribed waste. It's buried in a dedicated cell, separate from general waste, and covered immediately. Illegal dumping of asbestos carries penalties up to $1.6 million for individuals and $9.5 million for companies.

Property sale obligations

Under Victorian law, sellers must disclose known asbestos in a property. If asbestos has been professionally removed and you hold the documentation package (removal certificate, clearance certificate, disposal receipt), this satisfies disclosure requirements and provides assurance to buyers.

Ready to get started?

Whether you need the full removal service or just a licensed asbestos bin, we can help.

Asbestos removal enquiry

Tell us about the job and our team will get back to you with a quote. Enquiries are managed by DemoSmart.

To request a quote without JavaScript, Call us.